Visit the Kitsap Public Health District website for current information on COVID-19

Bair Property Coffee Stand (LU20-CUP-02)

Posted on July 27, 2020


NOTICE OF APPLICATION

PROJECT: Bair Property Coffee Stand (LU20-CUP-02)

LOCATION : 731 Bethel Avenue, Port Orchard, Parcel #4031-001-009-0004

PERMIT APPLICATIONS: Conditional Use Permit

DESCRIPTION OF PROPOSAL: Construction of a drive through and walk up coffee shop with approximately 13 parking stalls and one drive through lane.

APPLICANT: Charles and Patricia Bair, 1303 Lakehurst Drive, Bremerton WA 98312

REPRESENTATIVE: James Guerrero Architects Inc, 7520 Bridgeport Way, Lakewood WA 98499

DATE OF PERMIT APPLICATION: June 5, 2020, with additional materials submitted June 9 and June 12, 2020 DATE OF DETERMINATION OF COMPLETENESS: June 26, 2020

DATE OF NOTICE OF APPLICATION: July 24, 2020 LEAD AGENCY: City of Port Orchard ENVIRONMENTAL REVIEW: The City of Port Orchard has reviewed the proposed project for probable adverse environmental impacts and has determined that the project is exempt from SEPA under WAC 197-11-800(1)(b)(iv).  REQUIRED PERMITS: The following local, state, and federal permits/approvals are needed for the proposed project: Conditional Use Permit, Land Disturbing Activity Permit, Stormwater Drainage Permit, Building Permit REQUIRED STUDIES: No additional studies required at this time. Geotechnical analysis of the site will be required with the Land Disturbing Activity Permit. EXISTING ENVIRONMENTAL DOCUMENTS: None at this time.

PRELIMINARY DETERMINATION OF THE DEVELOPMENT REGULATIONS THAT WILL BE USED FOR PROJECT MITIGATION AND CONSISTENCY: Port Orchard Municipal Code Title 20. Comments on the project must be submitted by August 10, 2020 at 4:00 P.M. to the City of Port Orchard, Department of Community Development, 216 Prospect Street, Port Orchard WA 98366 or by email at [email protected].

Close window