1. Our doors are closed to the public, however we continue to serve the citizens of Port Orchard via telephone and email, Monday through Friday 8am to 4:30pm. Emergency services are available 24 hours a day by calling 911.
  2. KEDA is accepting CARES grant applications for small businesses.  Visit https://www.kitsapcaressmallbiz.com/ for more information.

NOA: McCormick Parcel A Civil Improvements

Posted on August 13, 2020


CITY OF PORT ORCHARD

Notice of Application

This is a public notice of a development proposal that may interest you. You have the right to comment on this application, receive notice, request a copy of the decision once made and appeal the project decision. Included in this notice is a summary of the proposal, code reference for associated permits that may be required, and the targeted timeframe for City review and decision. Please be aware there are deadlines for comments and appeal; if you do not adhere to these deadlines, your comments may not be considered and/or you may lose your right of appeal. Please read this notice carefully and call the Staff Contact listed in this notice if you have questions.

Date of Issuance: August 13, 2020

File Number: PW20-034 and PW20-035

Project Name: McCormick Parcel A Civil Improvements

Type of Application: Major Land Disturbing Activity; Stormwater Drainage (Type II)

Assessor Parcel Number: 042301-3-010-2006

Applicant: Contour Engineering LLC PO Box 949 Gig Harbor, WA 98335

Applicant Representative: Jeremy Haug Contour Engineering LLC PO Box 949 Gig Harbor, WA 98335

Date of Application: July 2, 2020

Date Application was Determined Technically Complete: July 31, 2020

Site Description: Location: McCormick Woods Dr SW and SW Old Clifton Rd Nearest road intersection: SW Old Clifton Rd and McCormick Woods Dr SW Size: 19.98 acres Zoning District: R2 Shoreline Designation: N/A

Project Permits included with Application: N/A

Description of Proposed Project: Construction of site development improvements for 53 lot subdivision including roadways, utilities, grading and drainage, and erosion control.

Preliminary State Environmental Policy Act (SEPA) Determination: The City of Port Orchard, as lead agency, issued a Mitigated Determination of Non-Significance on June 19, 2020 under Washington Administrative Code (WAC) 197-11-800.

Existing Studies and Environmental Documents Evaluating the Proposal: Traffic Impact Analysis, Infiltration Assessment, Geotechnical Report, Wetland Report.

Other Applicable Codes Which May Require Additional Project Review / Permits: POMC Title 12, POMC Title 13, POMC Title 20.

Public Comment Period and Appeals: Any interested person may comment on this application. The comment period will remain open for 14 days. The deadline to submit comments is August 27, 2020. Any interested person may request notification of any hearings or meetings and request a copy of the decision once made. Requests must be addressed to City of Port Orchard Permit Center, Attn: Public Works Permit Clerk, 216 Prospect Street, Port Orchard, WA  98366.

Any interested party may appeal a Type II decision to the Hearing Examiner within 14 calendar days of the Notice of Decision. The Notice of Decision will be provided to all parties of record.

Examination of File: To receive an electronic version of the application file, please call 360-874-5533 or email [email protected].  When contacting, indicate the Permit Number and Project Number for the file you would like to examine.

Staff Contact for this Application: Ian Smith, PE Civil Engineer [email protected] 360-876-4991

Review Authority: The Public Works Director. A Type II permit is an administrative decision and shall be reviewed consistent with the requirements of POMC 20.24.

Close window