1. City Council and Advisory Committee meetings will be held remotely through Zoom. Link and Meeting ID will be posted to each agenda. Click HERE to visit Council and Advisory page.
  2. For information regarding COVID-19, please visit the Kitsap Public Health District website at https://kitsappublichealth.org/CommunityHealth/CoronaVirus.php

REVISED NOTICE OF PUBLIC HEARING Maple Avenue Improvements and Water Main Replacement – LU19-SH SDP-03 and LU19-SH CUP-01

Posted on April 9, 2020


CITY OF PORT ORCHARD

REVISED NOTICE OF PUBLIC HEARING

This is a revised public notice changing the date and time that the City of Port Orchard will conduct a public hearing on the following project:

File Name: Maple Avenue Improvements and Water Main Replacement

File Number: LU19-SH SDP-03 and LU19-SH CUP-01

Application Type: Shoreline Substantial Development Permit and Shoreline Conditional Use Permit

Applicant: City of Port Orchard, 216 Prospect Street, Port Orchard WA 98366

Date of Application: June 19, 2019 (rev June 25, 2019 and January 24, 2020)

Date of Complete Application: July 23, 2019

Site Description: Location: 1004 Bethel Avenue, 381 Maple Ave, 321 Maple Ave, 200 Maple Ave, and the Maple Ave right-of-way.

Description of Proposal: Conveyance improvements associated with the Well 13 water system, including installation of 3,900 feet of 12” diameter water main, decommissioning the Well 6 facility, and realignment of Maple Avenue to improve roadway safety and stormwater drainage features.

SEPA Threshold Determination: A SEPA Determination of Nonsignificance (DNS) was issued for the project on February 28, 2020.

Required Permits: The following local, state, and federal permits/approvals are needed for the proposed project: Shoreline Substantial Development Permit, Shoreline Conditional Use Permit, Land Disturbing Activity Permit, Stormwater Drainage Permit

Applicable Code(s): Port Orchard Municipal Code Title 20, WAC 197-11 SEPA Rules.

THE PUBLIC HEARING WILL BE HELD USING REMOTE TECHNOLOGY ON/AT: April 22, 2020, 11:00 AM

TO PARTICIPATE IN THIS HEARING CONTACT [email protected] for instructions

Review of Documents: A copy of the hearing record, including the application and supporting documents, are available for inspection by the public at no cost. A copy of the staff report will be available for inspection at no cost at least seven (7) days prior to the hearing. Copies will be provided at the requestor’s cost.

Comment Period: Any person may provide public testimony or submit written comment until the close of record by the Hearing Examiner.

Submit Comments To:

Stephanie Andrews, Associate Planner

By Phone: (360) 874-5533

By Mail: 216 Prospect St, Port Orchard, WA  98366

By E-mail: [email protected]

Close window